The Arino Homes Process

Every luxury home begins in the ground.

The photos below are from real Arino Homes projects across Georgia. We believe our clients — homeowners and investors alike — deserve to see the work that happens long before the finishes go in. This is the discipline that protects your investment for decades.

Foundation · Structure · Framing · Roofing
  • Foundation
    Foundation
  • Structure
    Structure
  • Framing
    Framing
  • Sheathing
    Sheathing
  • Second Story
    Second Story
  • Roofing
    Roofing
  • Enclosed
    Enclosed
  • Foundation
    Foundation
  • Structure
    Structure
  • Framing
    Framing
  • Sheathing
    Sheathing
  • Second Story
    Second Story
  • Roofing
    Roofing
  • Enclosed
    Enclosed
Site Preparation & Excavation
Phase 01

Site Preparation & Excavation

Every Arino Homes project begins with careful site work — grading, drainage planning, and excavation shaped to the property. We survey the land, protect surrounding trees, and set the stage for a foundation engineered to last generations.

Foundation & Structural Base
Phase 02

Foundation & Structural Base

Poured-in-place concrete foundations with steel reinforcement, followed by pressure-treated sill plates and a level structural pad. The strongest possible base for a luxury home.

Rough Utilities & Site Prep
Phase 03

Rough Utilities & Site Prep

Rough plumbing, electrical conduit, and drain lines are routed before backfill. Getting this phase right is what separates a house that ages well from one that doesn't.

Waterproofing & Drainage
Phase 04

Waterproofing & Drainage

Foundation walls receive a full waterproof membrane along with perimeter drain tile and gravel — one of the biggest reasons Arino Homes stay dry, healthy, and valuable decades later.

First-Floor Framing
Phase 05

First-Floor Framing

Load-bearing walls, headers, and floor systems are framed from kiln-dried lumber. Every stud is squared and every opening is verified before sheathing goes up.

Second-Story & Sheathing
Phase 06

Second-Story & Sheathing

Upper-level walls rise, then OSB sheathing wraps the structure. Diagonal bracing and hurricane ties are installed — quiet details that carry real weather loads.

Roof Framing & Trusses
Phase 07

Roof Framing & Trusses

Roof trusses go up at golden hour with a full crew. Ridge, hips, and valleys are set to spec, and the home takes its final silhouette against the sky.

Ready to Start

Let's walk your site together.

Whether you own the land or want us to find it, we'll meet you on-site, discuss your vision, and outline a realistic path from foundation to finish.